Land by postcode · E area · E8
What the open records say about the E8 postcode district in Greater London: recent sales, planning designations and controls, and the council that decides applications. District-level facts to read before you sell or develop a plot in Hackney, London.
Residential sales recorded by HM Land Registry between 2024-08 and 2026-07. This is market context for the district, not a land valuation: what a plot is worth depends on what can be built on it, which these figures do not show.
Sales in 24 months
771
Median sale price
£610,000
Median £ per m² of floor area
£10,000
Median, last 12m vs prior 12m
-2%
£612,500 → £600,000
Mix of sales: 1% detached, 3% semi-detached, 14% terraced, 83% flats.
New-build sales 2023–2024: 70 of 781 (9%). A rough proxy for recent building activity: these are homes sold by builders, not development sites.
For each designation on the planning.data.gov.uk register, the share of the 731 live postcodes in E8 whose centroid falls inside it. This measures postcodes, not land area, and says nothing about any individual plot.
310 of 731 postcodes
Graham Road and Mapledene · Kingsland · Mare Street · Dalston Lane (West) · Clapton Square and 3 more
18 of 731 postcodes
1 separate direction recorded, each removing particular permitted development rights within a defined area.
No postcodes in E8 fall inside: Green Belt, National Landscape (AONB), National Park.
Flood zones, tree preservation orders, local plan allocations, settlement boundaries and non-designated heritage are not included here and are checked in a full assessment.
42% of postcodes fall within a conservation area. Inside one, demolition needs consent, some permitted development rights are reduced, and new work is assessed against the character and appearance of the area.
These are district-level facts. The free assessment checks your actual boundary against the same registers and the local plan and tells you plainly what they mean for your plot.
Decided planning applications in E8 since 2021, from the council registers, grouped by the kind of scheme a landowner might be weighing up. Extensions, conditions and tree works are left out. Counts, not estimates.
Taken from the units table on the planning form itself, so this is homes actually created, not a reading of the description. 52 decided since 2021, 20 refused, typically 253 days to a decision.
25 of 52
approved, 48%
50% across London
65 homes approved of 117 applied for
Approved examples
2A Forest Road, Hackney (3 new homes)
Conversion of the existing offices to 3 residential units, amend the elevations to add 3 new balconies and convert the entrance to the offic...
Approved 2026-08-19, Hackney ref 2025/0238
449 Kingsland Road, Hackney (3 new homes)
Redevelopment of the site through the partial demolition of the existing outrigger, with the retention and alteration of the flank walls, an...
Approved 2026-03-06, Hackney ref 2024/2261
Land To Rear Of 62 Navarino Road, London (1 new home)
Demolition of single storey outbuildings and erection of two storey, 3 bedroom new build dwelling house (use class C3), on a former commerci...
Approved 2025-12-03, Hackney ref 2021/2254
By the kind of plot, from the wording of each proposal:
13 decided since 2021, 3 refused, typically 268 days to a decision
9 of 13
approved, 69%
45% across London
Approved examples
449 Kingsland Road, Hackney
Redevelopment of the site through the partial demolition of the existing outrigger, with the retention and alteration of the flank walls, an...
Approved 2026-03-06, Hackney ref 2024/2261
Land To The Rear Of, 64 Middleton Road
Demolition of mechanic’s garage (use class B2) and erection of a two-storey 3 bedroom dwellinghouse (use class C3).
Approved 2025-08-11, Hackney ref 2022/0963
Santander, 86 - 88 Kingsland High Street
Partial demolition of the existing building and re-development of the upper floors and rear to provide a four-storey building and up to 7 re...
Approved 2025-07-11, Hackney ref 2022/2114
5 decided since 2021, 4 refused, typically 226 days to a decision
1 of 5
approved, 20%
48% across London
Approved examples
2A Forest Road, Hackney
Conversion of the existing offices to 3 residential units, amend the elevations to add 3 new balconies and convert the entrance to the offic...
Approved 2026-08-19, Hackney ref 2025/0238
Also decided here: 36 applications for outbuildings, annexes or garden buildings, 27 approved, typically 90 days.
Decided planning applications (not extensions, conditions or tree works) in this postcode district from the councils' own registers, classified by the wording of each proposal. Counts, not estimates; where a class has fewer than three applications it is not shown.
Applications for ten or more new homes decided since 2021 in E8 and the six districts next to it (E2, E5, E9, N1, N16, E1). The number of homes is taken from the planning form. 6 were approved, 2 were refused or withdrawn.
2 decided since 2021, 1 refused or withdrawn
19
homes approved in 1 scheme
10 - 22 Lamb Lane, Hackney (19 new homes, E8)
Demolition of existing building and erection of a part 5, part 6 and part 7 storey building to provide 19 residential units (9 x 1-bed, 6 x ...
Approved 2025-10-24, Hackney ref 2024/1869
6 decided since 2021, 1 refused or withdrawn
121
homes approved in 5 schemes
Most recent
FELLOWS COURT Weymouth Terrace, Hackney (28 new homes, E2)
Demolition of existing garage and construction of a new 6-storey 28 unit (13 x 2-bed & 15 x 3-bed) residential block (C3 use class) with ass...
Approved 2026-09-07, Hackney ref 2025/1324
London Borough Of Hackney, RECTORY ROAD AREA OFFICE (19 new homes, N16)
Construction of 19 new residential dwellings (Class C3) with associated amenity space, cycle parking, refuse stores, hard and soft landscapi...
Approved 2026-09-04, Hackney ref 2025/1208
67A Stoke Newington Road, Hackney (15 new homes, N16)
Erection of part two, part three, part four storey building facing Princess May Road and a five storey building facing Stoke Newington Road ...
Approved 2024-02-20, Hackney ref 2021/1807
Lindsey Mews Playground, Lindsey Mews (13 new homes, N1)
The construction of 13 new dwelling units comprising 2 x 1B2P units, 3 x 2B3P units, 2 x 2B4P units, 3 x 3B4P units, 2 x 3B5P units and 1 x ...
Approved 2023-06-22, Islington ref P2022/4295/FUL
Decided applications whose planning form declares ten or more net new homes, joined to the decision by reference. Care homes, hostels, student rooms, hotels and other room-based schemes are left out.
Property in E8 registered to UK companies, housing associations, councils and other organisations, from HM Land Registry's company ownership register (titles added up to September 2026). Homes owned by private individuals are not in this register.
Titles held by companies and organisations
3,141
Freehold titles
1,742
Leasehold titles
1,399
Titles held by overseas companies
99
By number of freehold titles in E8. Registration numbers are as listed with Land Registry.
Peabody Trust (7741)
263 titles
The Mayor and Burgesses of the London Borough of Hackney
247 titles
Clarion Housing Association Limited (7686)
124 titles
London & Quadrant Housing Trust (030441R, 30441R)
41 titles
Newlon Housing Trust (18449R)
23 titles
Southern Housing (8983)
18 titles
Ellingfort Creative Partnerships Limited (05431922)
12 titles
Hackney Housing Co-Operative Limited
12 titles
Hackney covers 97% of the sampled postcodes in E8.
Draw your boundary, tell us what you own, and an architect checks it against these registers and the local plan. Free, no obligation, and you get a straight written answer.
It depends on where the plot sits, not on the district average. In E8, 0% of postcodes are in the Green Belt, 42% in a conservation area. Outside those designations the questions that decide it are whether the plot is inside or adjoining the settlement boundary in the local plan, whether it has its own road access, and what is next to it. A plot on the edge of a village or town with access has the best chance; an open field outside the settlement boundary rarely gets consent for housing whatever the market is doing.
Often, yes. 2% of postcodes in E8 are under an Article 4 direction (1 separate direction), which withdraws particular permitted development rights, so an outbuilding, extension or change of use that is automatic elsewhere needs an application there. Outside those areas, permitted development applies to houses and their gardens but not to agricultural land or paddocks, where a new building or a new use normally needs permission or prior approval.
Developers look at three things before they talk about price: whether the plot is outside the Green Belt and any National Landscape, whether it sits inside or beside the settlement boundary, and what finished homes sell for. In E8 the median sale is £610,000, and only 9% of 2023–2024 sales were new-build homes, so builders have been quiet here. A single plot usually goes to a local builder or a self-builder; a site for five or more homes attracts regional housebuilders, normally through an option or a conditional contract rather than an outright purchase, so the price you see quoted is not the price you receive.
There is no district figure for land, because a plot's value comes from what can be built on it, not from where it is. As a guide, a serviced plot with consent for one house commonly sells for around a third of the finished house value, which in E8 would be measured against a £610,000 median sale. The same plot without consent, or inside the Green Belt, is worth a small fraction of that, and a paddock with no realistic route to consent is worth agricultural or amenity value only. The free check tells you which of those your plot is before you talk to anyone about a price.
Three places: Hackney's local plan and its policies map for the settlement boundary and allocations, the council's planning register for what has been approved or refused on neighbouring land, and planning.data.gov.uk for the national designations. That is an evening's work if you know what you are looking for. The alternative is to draw your boundary on this site: an architect checks it against the same records and writes back within 48 hours with a plain answer, free and without obligation.
Computed from open-data records; district-level, not plot-level measurements. Sales: HM Land Registry Price Paid Data (2024-08-01 to 2026-07-31), © Crown copyright, Open Government Licence. Designations: planning.data.gov.uk (OGL), retrieved 2026-09-05; conservation areas and Article 4 directions are made locally and published on that national register. Postcode centroids: OS Code-Point Open 2026.3.0, contains OS data © Crown copyright and database right 2026. Place name is the most common post town in the sales records. Figures computed 2026-09-06.